Wedding Mittens!!

I can’t believe it is Wednesday again, I think the days before Christmas fly by faster and faster every year. Speaking of flying by, Sara’s wedding is coming up and that means the deadline for her wedding mitts are too! Two and a half weeks left to go!

Wedding Mittens 2

I’ve been working on the mittens whenever I get a chance to do some sit-down knitting as opposed to the one row here or there I normally get. Which means I have been making some great headway on them, but feel like I am slacking off at the same time. I always watch TV when I do my sit-down knitting, so I feel as though I have been watching a lot of TV.
They’re looking really great though, I actually had to rip out about an inch of work the other day because when I started the pattern again, I started at the wrong spot. The curl was going completely the wrong way. I only noticed when I got up to the decreases for the top of the mitten and thought to myself that it looks quite shallow for a mitten.
You would have had to curl your fingers up in order to get the mitten on. So I rectified the mistake and kept on knitting. I actually managed to finish the outside of the first mitten while Sara was here. This was super satisfying because Sara is one of the most grateful people in the world. Especially since she, herself, knits; she knows the amount of work that goes into making a garment.

Wedding Mittens 1

I am going to make both outer shells, block them, then pick up the stitches for the lining. I can’t wait to see what they look like with the little hidden blue lining! They are going to be beautiful and last forever. I’ve been knitting them fairly tightly so in 1000 years people on an archeological dig will find these bad boys.